Wastewater Treatment Plant Rehabilitation Project Update #11

July Report-

*The new mechanical fine screen was placed on the headworks deck and piping started.

*The new screen’s control panel was installed.

*Aeration Basin air header piping was started.

*Diagrams of possible sanitary sewer connection in Omega Bay will be presented.

WWTP REHABILITATION AND ODOR CONTROL DESIGN

After demolishing the old mechanical screen, R & B Group filled in the old influent flow box and finished off the walkway.  They placed concrete stair landings and support pads. The new mechanical fine screen was placed, and piping started. The new control panel was set and conduit installed.

Richard Matthews- Omega Bay- LaMarque, Texas