Wastewater Treatment Plant Rehabilitation Project Update-03

The valves have been installed. The District is waiting on the temporary tanks to be delivered. Once they are delivered, they will be connected and the cleaning of the aeration basins will begin as per the schedule provided by AEI Engineering/R&B Group. The schedule for the project can be viewed at the MUD office. 2.7.19